| Key Words | Water Well Drilling Rig,Borehole Drill Rig |
|---|---|
| Crawler | Rubber Crawler |
| Weight Of The Rig(T) | 3.6 |
| Drilling Diameter(mm) | 138-203 |
| Drilling Depth (m) | 180 |
| Key Words | Water Well Drilling Rig,Borehole Drill Rig |
|---|---|
| Crawler | Rubber Crawler |
| Weight Of The Rig(T) | 3.6 |
| Drilling Diameter(mm) | 138-203 |
| Drilling Depth (m) | 180 |
| Key Words | Water Well Drilling Rig,Borehole Drill Rig |
|---|---|
| Crawler | Rubber Crawler |
| Weight Of The Rig(T) | 3.6 |
| Drilling Diameter(mm) | 138-203 |
| Drilling Depth (m) | 180 |
| Key Words | Water Well Drilling Rig,Borehole Drill Rig |
|---|---|
| Crawler | Rubber Crawler |
| Weight Of The Rig(T) | 3.6 |
| Drilling Diameter(mm) | 138-203 |
| Drilling Depth (m) | 180 |
| Name | GL120Y Crawler Chassis High Air Pressure DTH Drill Rock Drill Rig |
|---|---|
| Keyword | High Air Pressure Rock Drill Rig |
| Hole Dia. | 90-140mm |
| Hole Depth | 30-90m |
| Hammer | 4, 5, 6inch |
| Features | High Cost-effective |
|---|---|
| Boday Material | Alloy Steel |
| Packing | Wooden Box |
| Function | Facilitate Drilling Process |
| Safety Features | Designed To Minimize Risks And Accidents |
| Theoretical Flow Rate | 850L/min |
|---|---|
| Application | Drilling |
| Style | Horizontal |
| Structure | Piston Pump |
| Feature | High Presuress |
| After-sales Service Provided | Video Technical Support |
|---|---|
| Warranty | 12 Months |
| Usage | Water Well |
| Power Type | Diesel |
| Condition | New |
| After-sales Service Provided | Video Technical Support |
|---|---|
| Warranty | 12 Months |
| Usage | Water Well |
| Power Type | Diesel |
| Condition | New |
| Product Name | Core Drilling Rig |
|---|---|
| MOQ | 1set |
| Model NO. | GL300E |
| Condition | New |
| Transport Package | By Sea |