Rock Drilling Rig
![]()
Technical Parameter
Packing and Transport
1. Drilling machine is bare packing.
2. Drilling tools will be packed in cases or wooden boxes.
3.The delivery time for machine normally be 25-35 days after receiving payment. The drilling tools normally 3-5days if in stock.
4. Shipping by sea, air or express are all available.